NASHVILLE — As of July 30, 2004, the year-to-date total of $160,092,022.63 for Cooperative Program (CP) Missions is $7,770,920.36 ahead of the $152,321,102.27 received at this same point in 2003. Receipts of $17,272,883.97 were 29.90 percent, or $3,976,106.29, above the $13,296,777.68 received in July 2003.
Designated giving of $180,002,507.08 for the same year-to-date period is 14.02 percent, or $22,135,323.17, above gifts of $157,867,183.91 received at this point in 2003. The $8,303,093.81 in designated gifts received last month is $135,892.47 below the $8,438,986.28 of July 2003, a 1.61 percent decrease.
For the SBC Cooperative Program Allocation Budget, the year-to-date total of $160,092,022.63 is 105.37 percent of the $151,935,925.00 budgeted, or $8,156,097.63 above budget to support Southern Baptist ministries globally and across North America.
The SBC operates on an Oct. 1–Sept. 30 fiscal year.




Share with others: